USCG District Southwest CAC Reader & Camera System Installation
HOMELAND SECURITY, DEPARTMENT OF › US COAST GUARD › BASE ALAMEDA(00031)
- Solicitation
- 71111PR260059862
- Responses due
- September 23, 2026 at 9:00 PM
- NAICS
- 561621
- Set-aside
- Small Business Set Aside - Total
- Place of performance
- Alameda, CA
- Notice type
- Combined Synopsis/Solicitation
- Posted
- September 12, 2026 at 12:00 AM
InstantSam read all 3 attachments on this solicitation, 17,785 characters, and pulled out what it requires.
Scope of Work
This solicitation is for installation of an Access Control System (ACS) and Video Surveillance System (VSS) at multiple buildings on U.S. Coast Guard Island, Alameda, CA, for USCG District Southwest. The work has two major components:
Installation (CLIN 0001, one-time job): Site survey and design, inventory and inspection of Government Furnished Equipment (GFE), installation of CAC readers, electronic door hardware (maglocks, strikes, request-to-exit devices, local controllers), NDAA-compliant IP security cameras at designated ingress/egress points, structured cabling (CAT6 and specialized twisted pair), system integration, and end-to-end testing.
Monitoring and Maintenance Services (CLIN 0002, base plus four option CLINs 1002/2002/3002/4002): 12 months of continuous monitoring and maintenance per period, covering:
- Preventive Maintenance (quarterly): physical inspections, firmware/software updates, security patching, diagnostics, configuration backups.
- Corrective Maintenance (as-needed, 24/7): troubleshooting, repair, replacement of faulty components, parts and labor included.
- Lifecycle Management (ongoing): monitoring hardware/software lifecycle, 90-day advance notice to COR before End-of-Life/End-of-Support with a mitigation plan.
Specific building-by-building tasks (Section 5.0 of the SOW) include installation of CAC scanners, fail-open door locks, number pads, monitors (various sizes), and cameras at BLDG 50-7, 50-5, 51-2, 50-6, 52, 42, 51-4, 50-2, 50-8, and 54.
Government will provide certain GFE (AXIS door controllers, AXIS Camera Station licenses, pushbuttons, request-to-exit sensors, maglocks, PIV reader/cards, a high-security dual alarm unit) per the quantities listed in Section 4.0. The contractor is responsible for all other non-GFE components needed for a complete, functional system.
Key Requirements
- Conduct site walkthrough and submit drawings, wiring diagrams, configuration settings, and blueprints for government approval before installation.
- Conduct full inventory/inspection of GFE prior to installation.
- Provide initial assessment report and detailed installation plan to COR as formal submittal.
- All new hardware compatible with existing systems; doors must remain accessible by mechanical key as fail-safe.
- Any new building penetrations require prior written approval; exterior runs must be weatherproofed.
- Cameras must be NDAA compliant and provide sufficient resolution to positively identify individuals at access points.
- Cabling must prevent wear/tampering; Red/Black separation rules must be followed where applicable.
- System testing that may impact operations must occur after 1600 hours and be coordinated with the COR.
- ACS/VSS must integrate into the isolated Base "Services LAN" using dedicated VLANs as directed by USCG C5I; contractor must test, confirm, and document packet routing profiles before handover.
- Submittals required before work commences: installation/drilling/wiring schematics (COR review window of 5 to 10 business days, no work until written approval granted).
- Section 889 compliance: no equipment/components from Huawei, ZTE, Hytera, Hikvision, Dahua, or affiliates (FAR 52.204-25).
- Personnel requiring recurring access must comply with HSAR 3052.204-71.
- 24/7 emergency contact and defined SLA compliance required (see below).
- Site restoration: penetrations must be fire-stopped, altered surfaces restored to original condition.
- Background checks required for all personnel; personnel information submitted to COR 14 days prior to project start.
- Base access form (name and birthdate) submitted at least 72 hours before an employee's first day (matches the roster template in Document 1).
- Real ID-compliant driver's license or other federally approved ID required for base access.
- Vehicles require valid registration/insurance, must stay on marked paved roads absent written COR approval; contractor liable for damage from improper vehicle operation.
- Company-identifying clothing/badging and vehicle decals required.
- Work hours: 0700 to 1700, Monday through Friday, excluding federal holidays, unless otherwise approved in writing.
- Compliance with USCG Safety and Environmental Health Manual, COMDTINST M5100.47 (series), including hazardous materials handling and spill reporting.
- Use of GFCI devices when connecting to government-furnished power.
- Final acceptance only after COR inspection confirms all SOW tasks complete and site fully restored; final payment withheld until deficiencies corrected.
SLA Response/Resolution Times:
| Severity | Definition | Response SLA | Resolution SLA |
|---|---|---|---|
| Priority 1 (Critical) | Complete ACS/VSS outage, major security breach, loss of primary monitoring | 15 minutes | 4 hours |
| Priority 2 (Major) | Degraded performance, partial camera loss, loss of redundancy | 1 hour | 24 hours |
| Priority 3 (Minor) | Minor anomalies, non-critical bugs, general inquiries | 4 business hours | 5 business days |
Submission Instructions
Not specified in these documents. The provided materials include the pricing/CLIN schedule and the Statement of Work, but no instructions on proposal format, page limits, required volumes, delivery method, or point of submission are included. Offerors should consult the full solicitation on SAM.gov for these instructions before the response deadline of September 23, 2026.
Risks and Red Flags
- Access to Classified Workspaces (CWS): Multiple buildings include CAC scanner and camera installation inside Classified Workspaces. The SOW does not specify what personnel security clearance level, if any, is required beyond a standard background check and HSAR 3052.204-71 compliance. This should be clarified before bidding.
- GFE dependency: The project relies on Government Furnished Equipment (AXIS controllers, cameras licenses, request-to-exit sensors, maglocks, PIV readers). Delays or shortfalls in GFE delivery could affect schedule; the SOW does not specify a GFE delivery schedule or contractor recourse if GFE is late or defective.
- Tight approval windows layered on a compressed schedule: The COR has 5 to 10 business days to review installation schematics before any physical work can begin, yet the overall installation phases (Phases 2 to 5) are scheduled within roughly 13 weeks total. This could compress the actual installation timeline.
- SLA penalty ambiguity: Section 6.2 states the contractor will not be penalized for outages caused by unauthorized government configuration changes, but does not define the process for determining fault, which could create disputes during performance.
- Section 889 compliance: All installed equipment, including any non-GFE components sourced by the contractor, must avoid banned manufacturers (Huawei, ZTE, Hytera, Hikvision, Dahua). This requires sourcing verification and may affect equipment selection and cost.
- Fixed-price structure with as-needed 24/7 corrective maintenance: Corrective maintenance is required as-needed with no additional cost to the government, meaning the fixed price for CLIN 0002 and option CLINs must absorb unpredictable repair/replacement costs and rapid response staffing, which is a significant cost risk if system reliability issues arise.
- No pricing breakdown provided for GFE-adjacent labor versus materials: The unit price and amount fields in the CLIN schedule are blank in this excerpt, so it is unclear if a detailed cost/price breakdown is required separately.
- Weeks 6 to 10 (VSS installation) overlap with Weeks 4 to 8 (ACS installation): This concurrent scheduling may require sufficient labor force to run both installations in parallel.
Attachments read
| Attachment 1 | 257 characters |
| Attachment 2 | 2,899 characters |
| Attachment 3 | 14,629 characters |
We do not host these files. Download the originals from SAM.gov
Amendment history
No amendments yet. We will update this page the day one lands.
There are three more sections in the full review
How this solicitation is evaluated, whether you are eligible to bid it against your own NAICS codes and set-aside status, and a bid or no-bid assessment. Plus the compliance checklist, and an assistant that answers questions from the notice itself.
Evaluation Criteria · Eligibility and Set-Aside · Bid / No-Bid Considerations