6515--Lecanto Community-Based Outpatient Clinic Patient Lift Package
VETERANS AFFAIRS, DEPARTMENT OF › VETERANS AFFAIRS, DEPARTMENT OF › 248-NETWORK CONTRACT OFFICE 8 (36C248)
- Solicitation
- 36C24826Q1041
- Responses due
- September 3, 2026 at 7:00 PM
- Questions due
- September 1, 2026
- NAICS
- 339113
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Place of performance
- Lecanto, FL
- Notice type
- Combined Synopsis/Solicitation
- Posted
- August 31, 2026 at 12:00 AM
InstantSam read all 5 attachments on this solicitation, 115,650 characters, and pulled out what it requires.
Scope of Work
The Department of Veterans Affairs, Network Contracting Office 8 (NCO 8), requires the purchase, delivery, and installation of ceiling mounted overhead patient lift systems for the VA Lecanto Community-Based Outpatient Clinic (CBOC) at 3949 West Gulf Lake Highway, Lecanto, FL 34461. This is being procured in connection with a new lease/build that will replace and expand the existing clinic. The lifts will be used by Primary Care and Radiology staff for safe patient movement to and from treatment tables.
Per the cut sheet (Document 5), the three units are to be installed in:
- PACT Exam Large, Room D109 (1 unit), Patient Aligned Care Team (PACT)
- General Radiology, Room K101 (1 unit), Radiology Service
- Ultrasound, Room K102 (1 unit), Radiology Service
Key Requirements
Brand name or equal item: Guldmann GH3 Overhead Lift System (Lifting Module).
Line items (Section B.2):
- 0001: Lift System, Overhead, Qty 3 EA
- 0002: Installation, Qty 1 EA
- 0003: Stamped Drawings, Qty 1 EA
Salient characteristics that any "equal" product must meet:
- Ceiling mounted, must not interfere with floor space
- Built-in power source, low energy consumption, ergonomically correct control units
- Emergency stop and lowering buttons
- Modular design allowing alteration and reinstallation
- Training, scale, and service module included
- Lifting capacity of 550 lbs per single strap
- Activated by light touch hand control
- LED indicators for charging, lowering, emergency, and battery status
- 2 to 4 hour battery recharge time
- Maximum lifting speed of 3.9 in/sec (no load) and 1.6 in/sec (330 lbs load)
- Overall dimensions approximately 22.75" D x 114.75" H x 103" W
Training: Contractor must provide delivery, installation, and training. No additional government training required.
Warranty: Standard manufacturer industry warranty term only. Extended warranties requiring advance payment are not accepted.
Delivery window: Not earlier than 10/20/2026 and not later than 11/20/2026, delivered between 8:00 AM and 4:30 PM, Monday through Friday equivalent business hours implied. No holiday deliveries accepted.
Period of Performance (per Section B.2): 09-01-2026 to 11-30-2026 (base period).
FOB: Destination.
Ship to / Mark for: VA Lecanto CBOC, Attn: Desmond Williams, 813-998-8000 x6209, desmond.williams1@va.gov.
Submission Instructions
- Quotes are due by the response deadline. Note: the documents contain conflicting deadline times (see Risks section).
- Questions must be submitted by email to the Contracting Officer, Katrina Tavares (katrina.tavares@va.gov), no later than Tuesday, September 1st at 12:00 PM Eastern.
- Solicitation incorporates FAR 52.212-1 (Instructions to Offerors, Commercial Products/Services) by reference; the full text of this provision is not included in the provided excerpt, so detailed submission mechanics (e.g., required attachments, page limits, quote format) are not specified in these documents.
- VA Form 10091 (Vendor File Request) is attached, required for vendors needing to establish or update EFT payment information with the VA Financial Services Center.
Risks and Red Flags
- Conflicting response deadlines: The SF 1449 (Document 1) and the Document 3 notice both list the response date as 09-03-2026 at 12:00 PM Eastern, but Document 2 (an amendment) states the solicitation was extended to 3:00 PM Eastern on the same date. Offerors should confirm the correct current deadline directly with the Contracting Officer before submission.
- Inconsistent archive periods: Document 2 lists a 60-day archive period after response date while Document 3 lists 90 days. This suggests possible version or amendment confusion and should be clarified.
- Period of Performance predates response deadline: The Price/Cost Schedule (Section B.2) lists a POP Begin date of 09-01-2026, which is before the stated response due date of 09-03-2026. This internal date inconsistency is not explained in the documents and should be clarified with the Contracting Officer.
- Stamped Drawings requirement vs. cut sheet data: Line item 0003 requires "Stamped Drawings" as a deliverable, but the cut sheet (Document 5) indicates "Shop Drawings Required: No" and "3rd Party Field Survey Required: No." This is a potential contradiction that should be clarified, since stamped drawings typically involve a licensed engineer and additional cost/time.
- Weight discrepancy: The cut sheet lists a weight of 24.50 lbs for a system rated to lift up to 550 lbs, which appears inconsistent, though this may simply be a data entry item in the cut sheet template rather than a contractual requirement.
- Buy American Act applicability: FAR 52.225-1 and 52.225-2 (Buy American, Supplies and Certificate) apply. Offerors must certify domestic content of the lift systems and installation materials, which may affect sourcing decisions if the equipment or components are manufactured overseas.
- Security Prohibitions and Exclusions clause (52.240-91, deviation): This clause references the American Security Drone Act and covered applications (e.g., TikTok) and covered foreign entities; the full text is cut off in the provided excerpt, so the complete list of prohibited components, entities, or country-of-origin restrictions is not specified in these documents. Offerors should obtain the complete clause text before certifying compliance.
- DEI clause (52.222-90, deviation): Contractor must certify it will not engage in "racially discriminatory DEI activities," with reporting obligations for subcontractors. This is a relatively new and specific compliance clause worth reviewing carefully.
- No extended warranties permitted: Any warranty proposal requiring advance payment for extended coverage will not be accepted, which may affect how contractors structure their standard commercial warranty offering.
- Small quantity, tight delivery window: Only 3 units are required, with delivery restricted to a one month window (10/20/2026 to 11/20/2026), which may be tight depending on manufacturing and shipping lead times for ceiling lift rail systems.
On the questions deadline, from the solicitation
Questions in response to this solicitation may be emailed to Katrina.tavares@va.gov NO LATER THAN 12:00PM on 9/1/2026.
Attachments read
| Attachment 1 | 100,065 characters |
| Attachment 2 | 1,421 characters |
| Attachment 3 | 2,319 characters |
| Attachment 4 | 8,852 characters |
| Attachment 5 | 2,993 characters |
We do not host these files. Download the originals from SAM.gov
Amendment history
No amendments yet. We will update this page the day one lands.
There are three more sections in the full review
How this solicitation is evaluated, whether you are eligible to bid it against your own NAICS codes and set-aside status, and a bid or no-bid assessment. Plus the compliance checklist, and an assistant that answers questions from the notice itself.
Evaluation Criteria · Eligibility and Set-Aside · Bid / No-Bid Considerations
Sign up free and read 3 solicitationsBrowsing and searching every federal opportunity is free forever.
This is our reading of a public solicitation, produced automatically, and it is a research aid rather than advice. Always confirm requirements and deadlines against the official notice on SAM.gov before you bid. How this compares to SAM.gov.