Closes today

Acquisition of Fan Coil Units

STATE, DEPARTMENT OF › STATE, DEPARTMENT OF › US EMBASSY ASHGABAT

Solicitation
PR16224057
Responses due
September 16, 2026 at 12:00 PM
NAICS
238220
Set-aside
No Set aside used
Place of performance
Ashgabat, TM-S
Notice type
Solicitation
Posted
September 9, 2026 at 12:00 AM

InstantSam read all 2 attachments on this solicitation, 155,723 characters, and pulled out what it requires.

Scope of Work

The U.S. Embassy in Ashgabat, Turkmenistan requires the furnishing and delivery of eighty-three (83) brand new fan coil units. The requirement is broken into three line items:

  • CLIN 0001: Fan Coil Unit, wall-mounted type, nominal dimensions L 120 x H 64 x D 23.5 cm, qty 59, Set
  • CLIN 0002: Fan Coil Unit, wall-mounted type, nominal dimensions L 157 x H 64 x D 23.5 cm, qty 12, Set
  • CLIN 0003: Fan Coil Unit, wall-mounted type, nominal dimensions L 190 x H 64 x D 23.5 cm, qty 12, Set

Per Amendment 0001, the fan coil type has been clarified as wall-mounted, with the anchoring point at the back of the housing, though the unit itself stands on the floor. Each fan coil unit set must include the fan coil unit, a compatible temperature controller, a compatible three-way thermostatic control valve, and all standard components necessary for connection and proper operation.

Key Requirements

Technical specifications per item:

  • Item 1: Cooling capacity 4.50-5.50 kW, heating capacity 8.00-9.50 kW, acceptable length 120-130 cm
  • Item 2: Cooling capacity 7.00-8.00 kW, heating capacity 8.50-10.00 kW, acceptable length 157-160 cm
  • Item 3: Cooling capacity 8.50-9.50 kW, heating capacity 13.00-14.00 kW, acceptable length 190-200 cm
  • All units: single-phase, 220-230 V AC, 50-60 Hz

Thermostatic control valve requirements:

  • Three-way thermostatic control valve with three connections
  • Connection size Ø20
  • Water temperature range 5-90°C
  • Electrical rating 220-230 V AC, 50-60 Hz
  • Power consumption 2.5 W
  • Reference product: EKON, Model DRF-01, or equal
  • Must be included in the quoted unit price, not priced separately

Vendor submission requirements:

  • Manufacturer name and model number for each offered fan coil unit
  • Manufacturer name and model number for the temperature controller and thermostatic valve
  • Technical data sheets demonstrating compliance
  • Fan coil dimensions and cooling/heating capacities
  • Electrical and water-connection requirements
  • Installation or connection schematic
  • Statement confirming the quoted unit price includes the fan coil unit, temperature controller, thermostatic valve, and all standard components

Other conditions:

  • All equipment new and unused, supplied as complete, compatible sets
  • Prices in U.S. Dollars, firm fixed price, no cost escalation adjustments
  • Delivery: DDP Incoterm, prices include delivery cost and customs clearance to U.S. Embassy Ashgabat
  • Delivery time: 90 calendar days after notice to proceed / award
  • Warranty: one year, honored in Ashgabat using locally available OEM parts
  • Payment: NET 30 days, 100% after delivery and acceptance, via bank transfer, no advance payment
  • Quotation validity: 45 days
  • VAT not applicable, must not be included in CLIN rates or invoices

Submission Instructions

  • Deadline (as amended): September 16, 2026, 17:00 Ashgabat time (the amendment text says "17:00 PKT" but references the same solicitation clock; treat the embassy's stated deadline as authoritative)
  • Submit in a sealed envelope marked "Quotation PR16224057 Enclosed" to the Contracting Officer, U.S. Embassy Ashgabat, New Embassy Compound (NEC), 28 Archabil Street, Ashgabat, 744000 Turkmenistan
  • Preferable method: email to ashgabatsolicitations@state.gov, with subject line indicating "RFQ No. PR16224057"
  • File formats: MS-Word 2007/2010, MS-Excel 2007/2010, or Adobe Acrobat (PDF); file size must not exceed 30MB, otherwise split into separate emails
  • Quotations must be in English; incomplete proposals will not be accepted
  • Late quotations will be rejected
  • Required submission documents:
  1. SF-1449
  2. Section 1, Pricing
  3. Section 5, Representations and Certifications
  4. Additional information as required in Section 3
  5. Proof of SAM registration
  • Quotation should be accompanied by adequate technical documentation in English for each item quoted
  • Vendors should state: quantity discount and early payment discount, separate quote for estimated transportation and insurance charges, availability of local service in country of final destination, details on warranty/guarantee conditions, and delivery period

Risks and Red Flags

  • The solicitation cover letter and pricing continuation pages reference a different RFQ number ("PR16174705") in a few places (envelope marking instruction and continuation page header), while the primary solicitation number is PR16224057. This inconsistency could cause confusion in submission labeling.
  • The amendment states the closing date/time as "September 16, 2026 at 17:00 PKT" (Pakistan time), which is likely a drafting error since the embassy is in Turkmenistan and all other references use Ashgabat time. Offerors should seek written clarification on the exact deadline and time zone.
  • Technical specifications were clarified late via amendment (issued September 09, 2026, close to the original response deadline), changing the requirement to explicitly wall-mounted units, which may require offerors to re-verify product compatibility.
  • The thermostatic valve reference brand (EKON, Model DRF-01) may limit sourcing options; "or equal" language is included but compliance demonstration is required.
  • Firm fixed price with no cost escalation adjustment, combined with DDP delivery terms (including customs clearance) to Turkmenistan, places substantial logistics, customs, and currency risk on the contractor.
  • Delivery timeline is tight: 90 calendar days after award for procurement, manufacturing, shipping, and customs clearance of 83 units to a landlocked, sanctioned-adjacent country.
  • Warranty must be honored locally in Ashgabat using OEM parts, which may be difficult given limited local service infrastructure in Turkmenistan.
  • Payment is NET 30 after delivery and acceptance with no advance payment authorized, requiring the contractor to fully finance production and shipping costs upfront.

Attachments read

Attachment 1150,910 characters
Attachment 24,813 characters

We do not host these files. Download the originals from SAM.gov

Amendment history

  • Deadline moved to Not listed.

    September 9, 2026 at 10:03 AM

  • 1 new document attached.

    September 9, 2026 at 10:03 AM

There are three more sections in the full review

How this solicitation is evaluated, whether you are eligible to bid it against your own NAICS codes and set-aside status, and a bid or no-bid assessment. Plus the compliance checklist, and an assistant that answers questions from the notice itself.

Evaluation Criteria · Eligibility and Set-Aside · Bid / No-Bid Considerations

Sign up free and read 3 solicitations

Browsing and searching every federal opportunity is free forever.

This is our reading of a public solicitation, produced automatically, and it is a research aid rather than advice. Always confirm requirements and deadlines against the official notice on SAM.gov before you bid. How this compares to SAM.gov.

PR16224057: Acquisition of Fan Coil Units | InstantSam